Technical Aspects
Important technical aspects of the project are as under:
S No.DescriptionDetails
01.Project ModeBuilt Operate and Transfer (BOT)
02.Total Length69 Kms
03.No of Lanes6
04.Required R.O.W100 m
05.No of Interchanges7 Nos
06.Flyovers5 Nos
07.Bridges20 Nos
08.Underpass16 Nos
09.Cattle Creeps11 Nos
10.R.C.C Pipe Culverts131 Nos
11.Box Culverts53 Nos
12.Subways25 Nos
13.Service Road21 Kms
14.Service Area2 Nos (450 x 300 m)
15.Main Toll Plaza2 Nos (8 Entry + 8 Exit)
16.ITS enabled Weighing Stations10 Nos
17.ITS enabled Weigh in Motion1 No
18.Centralized Operation Centre1 No (Within Service Area)
19.Advanced Traveler Info SystemAt RD 35+000
20.Emergency Call SystemAt every 2 Kms
21.Electronics SurveillanceAt every 10 Kms
22.Lane Width3.65 m
23.Inner Shoulders (paved)1 m
24.TST outer Shoulder3.0 m
25.Rounding1 m
26.DividerNew Jersey Barrier
27.Riding Quality· Upon Construction Completion – IRI < 1.4

· During the Operations Period – IRI < 3.0 Upon overlay/ rehabilitation – IRI < 1.8

· On the Transfer Date – IRI < 2.0