Technical Aspects
Important technical aspects of the project are as under:
S No. Description Details
01. Project Mode Built Operate and Transfer (BOT)
02. Total Length 69 Kms
03. No of Lanes 4 (extendable to 6 lanes in future)
04. Required R.O.W 100 m
05. No of Interchanges 7 Nos
06. Flyovers 5 Nos
07. Bridges 20 Nos
08. Underpass 16 Nos
09. Cattle Creeps 11 Nos
10. R.C.C Pipe Culverts 131 Nos
11. Box Culverts 53 Nos
12. Subways 25 Nos
13. Service Road 21 Kms
14. Service Area 2 Nos (450 x 300 m)
15. Main Toll Plaza 2 Nos (8 Entry + 8 Exit)
16. ITS enabled Weighing Stations 10 Nos
17. ITS enabled Weigh in Motion 1 No
18. Centralized Operation Centre 1 No (Within Service Area)
19. Advanced Traveler Info System At RD 35+000
20. Emergency Call System At every 2 Kms
21. Electronics Surveillance At every 10 Kms
22. Lane Width 3.65 m
23. Inner Shoulders (paved) 1 m
24. TST outer Shoulder 3.0 m
25. Rounding 1 m
26. Divider New Jersey Barrier
27. Riding Quality · Upon Construction Completion – IRI < 1.4 · During the Operations Period – IRI < 3.0 · Upon overlay/ rehabilitation – IRI < 1.8 · On the Transfer Date – IRI < 2.0