S No. |
Description |
Details |
01. |
Project Mode |
Built Operate and Transfer (BOT) |
02. |
Total Length |
69 Kms |
03. |
No of Lanes |
4 (extendable to 6 lanes in future) |
04. |
Required R.O.W |
100 m |
05. |
No of Interchanges |
7 Nos |
06. |
Flyovers |
5 Nos |
07. |
Bridges |
20 Nos |
08. |
Underpass |
16 Nos |
09. |
Cattle Creeps |
11 Nos |
10. |
R.C.C Pipe Culverts |
131 Nos |
11. |
Box Culverts |
53 Nos |
12. |
Subways |
25 Nos |
13. |
Service Road |
21 Kms |
14. |
Service Area |
2 Nos (450 x 300 m) |
15. |
Main Toll Plaza |
2 Nos (8 Entry + 8 Exit) |
16. |
ITS enabled Weighing Stations |
10 Nos |
17. |
ITS enabled Weigh in Motion |
1 No |
18. |
Centralized Operation Centre |
1 No (Within Service Area) |
19. |
Advanced Traveler Info System |
At RD 35+000 |
20. |
Emergency Call System |
At every 2 Kms |
21. |
Electronics Surveillance |
At every 10 Kms |
22. |
Lane Width |
3.65 m |
23. |
Inner Shoulders (paved) |
1 m |
24. |
TST outer Shoulder |
3.0 m |
25. |
Rounding |
1 m |
26. |
Divider |
New Jersey Barrier |
27. |
Riding Quality |
· Upon Construction Completion – IRI < 1.4
· During the Operations Period – IRI < 3.0
· Upon overlay/ rehabilitation – IRI < 1.8
· On the Transfer Date – IRI < 2.0 |